Draft ISP and Alternative Transmission Solutions

In February, the Real-time Digital Simulation Laboratory at UNSW Sydney (RTS@UNSW) submitted its comments to the Australian Energy Market Operator’s (AEMO) Draft 2020 Integrated System Plan document, the Draft ISP. Our submission, together with all other submissions to the consultation of the Draft ISP are available in the links below: [1]-[3]. [1] https://aemo.com.au/en/energy-systems/major-publications/integrated-system-plan-isp/2020-integrated-system-plan-isp [2] https://aemo.com.au/consultations/current-and-closed-consultations/2020-draft-isp-consultation

A brief introduction to (real-time) simulations

Nowadays, a new product or system needs to be tested, tested, and tested again before its launching, and yet it may fail or not achieve the expectations.  The energy sector is not the exemption, new technologies have arisen in the last decades to provide greater flexibility and security to the power system. Voltage-source converters or …

Design a site like this with WordPress.com
Get started